Zero Waste Traffic Islands
If the roading network requires resurfacing, there is no need to demolish precast traffic islands.
They can be simply lifted off the road while the resurfacing work is done.
They can be reinstalled without any waste. Precast traffic islands are a relocatable asset and fit well within Zero Waste policy.
Enquire Now